REALISED PROJECTS

mesa estudio lateral R med

DisQueSi Recording Studios

Acoustical concept and design of the new control room for DisQueSi Recording Studios. The request was to create a state of the art control room with stereo and 7.1 surround sound monitoring. The design process began in coorperation with the architects for conception of the primary structure of the building, the most reliable way for assuring not only to create a room that sounds incredible but also comply with technical recomendations from the EBU (tech 3276). Outstanding is the operational frequency curve of the control room, thanks to

Abrigueiro Estudio Control

Abrigueiro Recording Recording Studio

Because of an obvious lack of definition in the bass range within the control room, Arturo Vaquero, owner of the Abrigueiro Studios, requested a revision of the acoustics in his recording facilities. Initial measurements pointed

stage far

Foundation Reggae Festival

The «Foundation» is a reggae and dancehall festival celebrated anually in A Coruña, Galicia. From its beginning in 2001 there have been international artists visiting like Toots & The Maytals, Don Carlos and ASWAD along with local acts. Since 2009

plan 6

Audi AG – Product Presentation 2008

The worldwide retailer presentation of the “Audi Q5” took place in September of 2008 in Lisbon, Portugal. Centrepiece of the exhibition was a multimedia-based show performed at the Pavilhão Atlantico a multipurpose arena built for the Expo ’98. The main PA system was built of five line arrays

Control 2 Bungalow Studio de grabacion web

Bungalow Recording Studio

Complete acoustical design of a mid-size music recording studio. The control room is 25 square meters large with daylight and an enjoyable working atmosphere. The acoustic design is based on the non environmental concept and complies with the EBU recommendations (tech 3276) for maximum neutrality and dynamic

modell 02k

Homecinema wanted?

Another acoustic projected I finished during 2014. Done with modular panels which can be quite easily built, apart from looking great! The work is based on the recommendations of the EBU and the german Surround Sound Forum.

9

Annual Shareholder’s Meeting – Deutsche Bank

Taking place at the “Festhalle” in Frankfurt, Germany, the DB’s annual general meeting is an event that meets the highest standards at all technical levels. For legal reasons its sound reinforcement has to implement a particular speech intelligibility, apart from an overall percieved superb quality,

Usamos las cookies necesarias para el correcto funcionamiento de la página. Si continúa usando este sitio web, suponemos que está de acuerdo.